Task report for specific version
Hello,
Is it possible to create a task report which only shows tasks from a specific space version?
I have incomplete tasks which name me, and have been versioned. These are showing up like duplicates in the task reports. I'll never complete the tasks on old versions, so some way to exclude those from the task report would be very useful.
Br
Henrik
-
Hi Henrik,
I’m assuming you’re referring to Confluence native Task report macro, is this correct? If so, Scroll Versions is not fully compatible with this report, which explains why you see each task from each version. We also don’t have another solution for this.
However, there is one manual workaround you could try. If you have a versioned page with a task on it, add a label to that page identifying which version the page belongs to. Next, in your task report you could reference the version specific label in the Task report macro, this should only display the tasks on the versioned pages with this label. I recommend trying this in a test environment first to see if the results are satisfying.
I hope this could be of help.
If you have more questions don’t hesitate to reach out to our support: help@k15t.com
Cheers,
Johanna (K15t).
Please sign in to leave a comment.
Comments
1 comment